Vera Rubin NVL72 Supplier Ring

Nvidia · Rubin · 52 supplier rows

The Nvidia Vera Rubin NVL72 is built from 18 component groups supplied by 38 named companies. One of 18 components has some US production today and none has US production planned; five are not disclosed.

Supplier ring for Nvidia Vera Rubin NVL72: 18 components arranged in a ring, each shaded by whether its best-known supplier makes it in the US, makes some in the US, plans US production, makes it abroad, or does not disclose where Accelerator CPU HBM Packaging PCB, substrate Tray ODM Rack build Scale-up switch Scale-up cable NIC Optics Power shelf Busbar Battery backup CDU Cold plates Quick disconnects Enclosure Vera Rubin NVL7272 accelerators Made in US Some US volume US planned Made abroad Not disclosed
Supplier rows
52
Named suppliers
38
US now
1 of 18
US planned
0 of 18
Hub
Supply Chain

At a glance

Platform Summary

Renamed from NVL144; Kyber NVL144 with Rubin Ultra follows. See Rack Layer.

Nvidia Vera Rubin NVL72 at a glance
ItemValue
DesignerNvidia
AcceleratorRubin
Host CPUVera
Accelerators per unit72 (One rack)
Scale-up fabricNVLink 6 (nine switch blades)
Scale-out fabricConnectX-9; Spectrum-X Ethernet
CoolingDirect-to-chip liquid
Power (kW)Not disclosed
StatusRamping, volume from 2026-H2

Supplier ring

Who Makes Each Component

Supplier ring for Nvidia Vera Rubin NVL72
ComponentSupplierRoleMade inUS statusEvidenceNotes
AcceleratorNvidiaRubin GPU; TSMC 3 nmSoleTaiwanTSMC TaiwanMade abroadClaimed SourceRack renamed NVL72 from NVL144; Kyber NVL144 Rubin Ultra slipped to 2028
CPUNvidiaVera CPU; TSMC 3 nmSoleTaiwanTSMC TaiwanMade abroadClaimed Source88 Olympus Arm cores
HBMSamsungPrimarySouth KoreaPyeongtaek and CheonanMade abroadClaimed SourceHBM4; passed 10-11Gb/s qualification first
HBMSK hynixPrimarySouth KoreaIcheon and CheongjuMade abroadClaimed SourceHBM4 288GB per GPU
HBMSK hynixSecond sourceUnited StatesWest Lafayette INMade abroadCommitted SourceWest Lafayette IN plant broke ground Aug 2026; HBM mass production 2H 2029, after Vera Rubin NVL72
HBMMicronSecond sourceJapan, TaiwanHiroshima DRAM; Taichung packagingMade abroadClaimed SourceHBM4 aimed at Rubin CPX not flagship
Advanced packagingTSMCCoWoS-LPrimaryTaiwanZhunan AP6 and Tainan AP8Made abroadClaimed SourceCoWoS capacity tight through Rubin ramp
Advanced packagingTSMCArizonaSecond sourceUnited StatesTSMC Arizona, Phoenix AZMade abroadCommitted SourceFirst TSMC Arizona packaging plant due before 2029, after Vera Rubin NVL72 volume
Advanced packagingAmkorSecond sourceUnited StatesArizona campus (Peoria)Made abroadCommitted SourceAmkor Peoria AZ production 2028; no Rubin packaging tie disclosed
Advanced packagingSPILSecond sourceTaiwanDouliu (CoWoS line under construction)Not disclosedClaimed SourceArizona test site decision pending
PCB and substrateVictory Giant TechnologyPrimaryChina, Thailand, VietnamHuizhouMade abroadClaimed SourceRubin sampling partner; 78+ layer boards for Rubin Ultra
PCB and substrateElite MaterialPrimaryMade abroadClaimed SourceCCL
PCB and substrateIbidenPrimaryJapanMade abroadClaimed SourceABF substrate; Rubin-specific share not found
PCB and substrateUnimicronSecond sourceTaiwanMade abroadClaimed SourceVR PCB chain; specific board not stated
PCB and substrateZhen Ding TechSecond sourceMade abroadClaimed SourceVR PCB chain
PCB and substrateTaiwan Union Technology (TUC)Second sourceMade abroadClaimed SourceCCL
Compute tray ODMFoxconnPrimaryMexico, TaiwanMade abroadCommitted SourceFirst VR rack shipments Q4 2026; targets 50% share
Compute tray ODMWistronPrimaryTaiwan, United StatesWistron D1, Fort Worth TXNot disclosedCommitted SourceVR superchips at Fort Worth later; no date
Compute tray ODMQuantaSecond sourceTaiwanNot disclosedClaimed SourceMass shipments from Q3 2026
Rack integrationFoxconnPrimaryMexico, TaiwanMade abroadCommitted SourceVolume becomes mainstay in 2027
Rack integrationFoxconnSecond sourceUnited StatesHouston TXNot disclosedCommitted SourceHouston plant under construction; VR scope not stated
Rack integrationQuantaSecond sourceTaiwan, United StatesFremont CANot disclosedClaimed SourceShowed VR racks at Computex
Rack integrationWistronSecond sourceTaiwan, United StatesWistron D1, Fort Worth TXNot disclosedClaimed SourceShowed VR racks at Computex
Rack integrationInventecSecond sourceMexico, Taiwan, United StatesKaty TXNot disclosedClaimed SourceShowed VR racks at Computex
Rack integrationWiwynnSecond sourceMexico, MalaysiaNot disclosedClaimed SourceListed as VR system partner
Rack integrationSupermicroSecond sourceUnited States, Taiwan, MalaysiaSan Jose CASome US volumeCommitted SourceSupermicro builds racks in San Jose CA; share of this platform built there not disclosed
Rack integrationDellSecond sourceNot disclosedClaimed SourceVR supplier status unconfirmed
Rack integrationHPESecond sourceNot disclosedClaimed SourceNo VR build site found
Scale-up switchNvidiaNVLink 6 SwitchSoleTaiwanTSMC TaiwanMade abroadCommitted SourceNine switch blades; 3.6 TB/s per GPU
Scale-up cablingAmphenolPrimaryNot disclosedClaimed SourceOberon copper spine incumbent; VR award not confirmed
Scale-out NICNvidiaConnectX-9SoleTaiwanTSMC TaiwanMade abroadCommitted Source1.6 Tb/s SuperNIC; BlueField-4 DPU alongside
Optical transceiversFabrinetPrimaryThailandChonburiMade abroadClaimed SourceSpectrum-X Photonics ecosystem; Rubin supply unconfirmed
Optical transceiversCoherentSecond sourceUnited StatesSherman TX (lasers only)Not disclosedCommitted SourceSherman lasers feed co-packaged optics; transceiver assembly site not disclosed
Optical transceiversLumentumSecond sourceNorth CarolinaNot disclosedCommitted SourceAdvancing US optics manufacturing with Nvidia
Optical transceiversInnoLightSecond sourceChina, ThailandMade abroadClaimed SourceIncumbent; VR share not found
Optical transceiversEoptolinkSecond sourceChina, ThailandMade abroadClaimed SourceIncumbent; VR share not found
Power shelfFlexPrimaryNot disclosedCommitted Source110 kW 3RU shelf; six 18.4 kW PSUs at 52 VDC
Power shelfDelta ElectronicsPrimaryThailand, ChinaMade abroadClaimed Source800 VDC solutions shown for VR
Power shelfLite-OnSecond sourceMade abroadClaimed Source800 VDC solutions shown for VR
Power shelfLite-OnSecond sourceUnited StatesMcKinney TXNot disclosedCommitted Source$919M AI power site; groundbreaking Sep 2026; no start date
Rack busbar and power distributionBizLinkPrimaryNot disclosedCommitted SourceAC input and output connectors with Amphenol; busbar maker undisclosed
Battery backup and capacitorsFlexIntegrated energy buffer in power shelfPrimaryNot disclosedCommitted SourceOver 1200 J pulsation buffer per PSU
Battery backup and capacitorsNot disclosedBBUPrimaryNot disclosedClaimed SourceBBU demand rising; no supplier named
Coolant distribution unitSupermicroPrimaryNot disclosedCommitted Source1.8 MW in-row CDUs N+1 with its VR racks
Coolant distribution unitVertivSecond sourceNot disclosedClaimed SourceNamed Nvidia cooling partner; VR CDU award not stated
Cold plates and manifoldsAsia Vital Components (AVC)PrimaryMade abroadClaimed SourceVR cold plates shipping Q3 2026; Nvidia centralized buying
Cold plates and manifoldsCooler MasterSecond sourceMade abroadClaimed SourceOne of four named cold-plate vendors
Cold plates and manifoldsBoydSecond sourceNot disclosedClaimed SourceOne of four named cold-plate vendors
Cold plates and manifoldsAurasSecond sourceMade abroadClaimed SourceOne of four named cold-plate vendors
Quick disconnectsNot disclosedPrimaryNot disclosedClaimed SourceFositek and Global Tek incumbent on GB300; VR award not found
Rack enclosureChenbroPrimaryTaiwanMade abroadClaimed SourceVR-compatible rack and chassis shown
Rack enclosureKing SlideSecond sourceTaiwanMade abroadClaimed SourceServer rails

US share

What Is Made in the US

  • Rack integration: Supermicro, San Jose CA. Some US volume.

Record

Dataset Record

Dataset
Supplier ring for Nvidia Vera Rubin NVL72: 52 rows across 18 components
Sources
Company filings and press releases, SemiAnalysis, TrendForce, DigiTimes, KGI and Morgan Stanley via Taiwan press, Nvidia, AMD, Google, AWS, Microsoft, Cerebras; source link on each row
Last verified
October 2026