What it is
Government Workloads Are Sorted by Secrecy
Government and defense workloads run on clouds and supercomputers certified for the data they handle, from public records to Top Secret intelligence.
- Contract: the Pentagon's Joint Warfighting Cloud Capability contract, with a $9 billion ceiling, is split among AWS, Microsoft, Google and Oracle; a follow-on, JWCC Next, is planned.
- Classified clouds: AWS runs two Top Secret and two Secret regions at undisclosed locations, the newest opened in October 2025.
- Supercomputers: the national labs run nuclear weapons simulation on machines such as El Capitan at Lawrence Livermore. See HPC Clusters.
Flagship
AWS's Classified Regions and a 1.3 GW Build
- Regions: AWS Top Secret-East opened in 2014, the Secret Region in 2017, Top Secret-West was announced in 2021, and Secret-West went live in October 2025. Locations are not disclosed.
- Build: in November 2025 AWS announced up to $50 billion for AI and supercomputing capacity for government customers across its Top Secret, Secret and GovCloud regions, adding 1.3 GW, with groundbreaking in 2026. No construction start has been confirmed.
AI
The Pentagon Is Rolling Out Generative AI
- GenAI.mil: launched in December 2025 at Impact Level 5, the tier for controlled unclassified data. It passed 1.3 million users, and users have built more than 100,000 agents. It launched on Google's Gemini; OpenAI and SpaceXSI models are planned.
- Contracts: in July 2025 the Pentagon's AI office gave Anthropic, Google, OpenAI and xAI, now SpaceXSI, contracts of up to $200 million each. In March 2026 it designated Anthropic a supply chain risk after Anthropic declined to drop its limits on mass domestic surveillance and autonomous weapons, giving agencies six months to phase out Claude.
- Genesis Mission: DOE's AI science program, launched in November 2025, signed agreements with 24 companies, including AWS, Google, Microsoft, Nvidia, OpenAI and Anthropic.
Federal land
AI Campuses on Energy Department Land
In July 2025 DOE picked four sites for private AI data centers: Idaho National Laboratory, Oak Ridge, Savannah River and Paducah.
- Savannah River, South Carolina: Amentum, with DC BLOX, was chosen in July 2026 to negotiate a lease for a 1 GW campus with about 2 GW of on-site power, starting on gas and moving to nuclear.
- Paducah, Kentucky: Brookfield plans a 1.8 GW AI campus with 2 GW of NextEra gas generation and up to 2.6 GW of batteries, finishing in 2031.
See PORTS Technology Campus for DOE's site in Ohio.
Sites
Government and Defense Compute
| System | Where | What it does | Status |
|---|---|---|---|
| AWS Top Secret-East, Top Secret-West, Secret, Secret-West | Undisclosed | Classified cloud regions | Operating; Secret-West since October 2025 |
| AWS government AI and HPC build | Top Secret, Secret and GovCloud regions | 1.3 GW, up to $50B | Announced November 2025 |
| GenAI.mil | Impact Level 5 | Pentagon generative AI; 1.3M users, 100,000+ agents built | Operating since December 2025 |
| El Capitan | Lawrence Livermore, CA | Nuclear stockpile simulation, 1.8 exaflops | Operating |
| Solstice and Equinox | Argonne, IL | 100,000 and 10,000 Nvidia Blackwell GPUs, with Oracle | Announced |
| Mission and Vision | Los Alamos, NM | HPE with Nvidia Vera Rubin | 2027-2028 |
| Savannah River AI campus | Aiken, SC, DOE land | 1 GW with ~2 GW on-site power; Amentum and DC BLOX | Lease under negotiation |
| Paducah AI campus | Paducah, KY, DOE land | 1.8 GW; Brookfield with NextEra power | Announced; 2031 |
Record
Dataset Record
- Dataset
- Government cloud regions, defense AI and DOE AI campuses
- Sources
- AWS, Department of Defense, DOE, NNSA, LLNL, HPCwire, Nextgov, ExecutiveGov, American Nuclear Society, AP
- Last verified
- October 2026