TACC Horizon

Academic supercomputing · Round Rock, Texas · Texas Advanced Computing Center, UT Austin, for NSF

Horizon is the largest academic supercomputer in the US, built for NSF in a leased commercial data center rather than on campus. Its liquid-cooled GPU racks went live in July 2026; its CPU half follows by early 2027, for about 10 times Frontera's simulation speed.

TACC Horizon's racks drawn to scale by power: 28 GPU racks at about 215 kW each and 66 CPU racks at over 100 kW each, and Horizon's FP64 performance compared with Frontera HORIZON RACKS, HEIGHT TO SCALE BY REPORTED KW SABEY, ROUND ROCK 28 GPU RACKS~215 kW each, reported2,000 GB200 NVL4 nodes,~4,000 Blackwell GPUsOperating since July 2026 66 CPU RACKS, 100+ kW EACH: 4,752 NVIDIA VERA NODES, ~836,000 CORESDUE WINTER 2026 TO EARLY 2027 FP64 SIMULATION, PETAFLOPS Frontera, 201923.5 PF Horizon, 2026300 PF AI: 20 EXAFLOPS AT BF16, 80 AT FP4. DATA CENTER RATED 15-20 MW.
NSF award
$457M
Data center
15-20 MW
FP64
About 300 PF
AI, BF16
20 exaflops
GPU partition
Live July 2026
Hub
Deployments

The system

Grace Blackwell GPUs and Vera CPUs, Liquid-Cooled

  • GPU partition: 2,000 Dell nodes of Nvidia GB200 NVL4, two Blackwell GPUs and one Grace CPU each, about 4,000 GPUs in 28 racks.
  • CPU partition: 4,752 Nvidia Vera nodes, about 836,000 cores, due between winter 2026 and early 2027.
  • Performance: about 300 petaflops at FP64, roughly 10 times Frontera; 20 exaflops at BF16 and 80 at FP4.
  • Storage and network: 400 PB of all-flash VAST Data storage at more than 10 TB/s, a Spectra Logic and Versity archive, and Nvidia Quantum-X800 InfiniBand at 800 Gb/s.
  • Cooling: direct liquid cooling in Dell IR7000 racks. TACC has not published rack power; an independent systems wiki reports about 215 kW per GPU rack and over 100 kW per CPU rack.
  • Status: phase one finished in July 2026 with GPU racks operating for early, internal users. NSF's $457M award covers the system, rent and operations; 10,000 to 15,000 researchers a year are expected.

The site

An NSF Supercomputer in a Commercial Colocation Building

TACC chose a Sabey Data Centers campus in Round Rock, Williamson County, in August 2024 instead of its J.J. Pickle Research Campus. Sabey replaced a former Sears Teleserv building with two high-density buildings; the Horizon data center is rated 15 to 20 MW. Distributed partners in NSF's Leadership-Class Computing Facility are NCSA, the Pittsburgh Supercomputing Center, the San Diego Supercomputer Center and the Atlanta University Center Consortium. See Horizon at Sabey Round Rock on AustinIO.

TACC's other systems

Frontera Retires as Horizon Arrives

  • Frontera: Dell, about 8,000 Intel nodes, 23.5 petaflops, in service since 2019; its queues closed September 30, 2026, with data kept accessible for migration.
  • Vista: Nvidia Grace Hopper GH200 and Grace CPU nodes, in production since September 2024 and a NAIRR resource.
  • Stampede3: still running, offered as a CPU stopgap until Horizon's CPU partition arrives.

NAIRR

NAIRR Moves From Pilot to Permanent

The National AI Research Resource pilot, launched January 2024, has served about 900 research teams across all 50 states. In September 2026 NSF awarded $35M over five years to the San Diego Supercomputer Center, with TACC as partner, to run a NAIRR Operations Center with monthly allocations. Texas now holds both NSF flagship computing roles: leadership computing through Horizon and NAIRR operations through TACC.

Academic AI clusters

University AI Clusters Count GPUs in the Hundreds

Other US academic AI systems
SystemScaleStatus
DeltaAINCSA, Illinois608 H100-class (GH200)Production since November 2024; NAIRR resource
NexusGeorgia Tech, AtlantaMore than 400 PFUnveiled October 12, 2026; $20M NSF
TX-GAINMIT Lincoln Laboratory, Holyoke, MAMore than 600 GPUs; 2 AI exaflopsOnline since summer 2025
Kempner AI ClusterHarvard, Holyoke, MA1,144 GPUs incl. H200 and H100Operating
UT Center for Generative AIUT Austin and TACCMore than 1,000 GPUsDoubled November 2025; part-funded by $20M from the Texas Legislature
Empire AI BetaUniversity at Buffalo, NY11 times Alpha's training capacityOnline August 2026; Gamma due end of 2027; $500M state program
GautschiPurdue, Indiana160 H100Dedicated October 2024
Princeton AI clusterPrinceton, NJ300 H100Operating since 2024
CalComputeUniversity of CaliforniaNone yetFramework due January 2027 under state law SB 53

UT Austin says it has more than 5,000 Nvidia GPUs in all, more than 4,000 of them Blackwell. No academic system publishes its power draw except Horizon's building rating.

Record

Dataset Record

Dataset
US academic and NSF AI systems: scale, funding and status
Sources
TACC, NSF, City of Round Rock, SDSC, NCSA, Georgia Tech, MIT, Harvard Crimson, Purdue, University at Buffalo, UT Austin, HPCwire, The Next Platform, DatacenterDynamics
Last verified
October 2026