Who Pays for the Grid Data Centers Need
A data center campus can add as much load as a city. The question is whether the cost of the new power plants, transmission lines and substations lands on the data center or on every other customer on the grid.
- Bills: US residential prices rose 5% in 2025 and the EIA forecasts nearly 5% more in 2026, to 18.2 cents per kWh. In PJM states, retail increases from June 2025 ranged from 10% to 20% in New Jersey and Pennsylvania.
- The case that data centers raise rates: PJM's market monitor attributes 46% of four years of capacity costs to data center load. A Carnegie Mellon and NC State study estimates data centers could raise US generation costs 8% by 2030 and more than 25% in northern Virginia. Harvard's Electricity Law Initiative argues special contracts shift costs to households.
- The case that they need not: Lawrence Berkeley National Laboratory found states with the fastest load growth generally saw real prices fall, because fixed grid costs are spread over more sales, though LBNL noted sudden load spikes can raise prices in the near term. An Amazon-funded study by E3 found its data centers covered their cost of service.
- Tariffs: Ohio, Virginia, Georgia, Indiana and Oregon now put large loads in their own rate classes, with minimum-payment contracts so households are not left with stranded costs; Texas's SB 6 sets cost-sharing and curtailment rules for loads of 75 MW and up.
- Politics: power prices were a central issue in the 2025 Virginia and New Jersey governor races, and more than $45M in 2026 campaign ads mentioned data centers, split almost evenly between the parties.
- China: households pay less than industry, and western provinces sell data centers power at about half the eastern price under regional subsidies.
Flagship
PJM: The Capacity Auction That Made It a Bill Issue
- Market: PJM runs the grid for 13 states and Washington, DC, and buys capacity three years ahead through an annual auction.
- Jump: the 2025/26 auction cleared at $269.92 per MW-day, about nine times the prior year, for a total of $14.7B. The next three auctions all hit the price cap, near $330.
- Attribution: the market monitor, Monitoring Analytics, attributes $29.4B of $63.6B across the four auctions to data center load, much of it for data centers not yet built. PJM does not publish its own figure.
- Response: after a January 2026 statement from the White House and all 13 governors, PJM extended the price cap and filed for a backstop auction to buy about 6.8 GW on long contracts, with costs aimed first at utilities serving new data centers. FERC suspended it pending review.
- Still short: the 2028/29 auction cleared 6,831 MW below the reliability requirement.
Cases
Tariffs, Auctions and Pledges
| Case | What | Date |
|---|---|---|
| PJM capacity auction 2025/26 | $269.92/MW-day, up from $28.92; $14.7B total | July 2024 |
| PJM capacity auction 2028/29 | $325/MW-day at the cap; 6,831 MW short of the reliability requirement | July 2026 |
| PJM Reliability Backstop | About 6.8 GW on contracts up to 15 years; FERC suspended it to February 2027 | Filed 2026 |
| AEP Ohio data center tariff | Loads over 25 MW pay for at least 85% of subscribed demand for up to 12 years | July 2025 |
| Dominion GS-5 rate class, Virginia | Separate class for large loads; 14-year contracts with minimum demand charges | November 2025 |
| Oregon POWER Act | Data center class: residential rates down 1.3%, data center rates up 29% at PGE | July 2026 |
| Texas SB 6 | Loads of 75 MW and up share grid costs and can be curtailed in emergencies | June 2025 |
| FERC show-cause orders | All six FERC-regulated regional grid operators must justify or reform large-load rules; ERCOT is not covered | June 2026 |
| White House Ratepayer Protection Pledge | Seven AI companies pledge to pay for new generation and grid upgrades; not binding | March 2026 |
| China, East Data West Computing | Western data center power about 0.35 yuan/kWh against 0.6+ elsewhere under regional subsidies | Since 2022 |
| Ireland | Data centers used 23% of metered electricity; new sites must bring their own generation or storage | 2025 |
Record
Dataset Record
- Dataset
- PJM capacity auctions, large-load tariffs, rate studies and China power pricing
- Sources
- PJM, Monitoring Analytics via Utility Dive, FERC, PUCO, Virginia SCC, Georgia PSC, Oregon PUC, Lawrence Berkeley National Laboratory, EIA, Harvard EELP, Carnegie Mellon, E3, NJ BPU, Axios, NPR, Caixin, CSO Ireland, CRU
- Last verified
- October 2026