What it is
Running the Building Day and Night
Facility operations keeps power, cooling and the building running around the clock: shifts of technicians, scheduled maintenance, emergency procedures and the contractors who do much of the work.
- Staffing: large campuses run on dozens of people, not hundreds. Estimates put large sites at about 0.2-0.5 permanent staff per MW; Google's 500 MW Kansas City campus has about 200.
- Outsourcing: CBRE's data center services revenue grew 30% in Q2 2026, mostly from hyperscalers, and JLL manages 340 data centers.
- Liquid cooling: commissioning a liquid-cooled hall means flushing loops at 10-20 ft/s, filtering to 5 microns at the coolant units and testing fluid chemistry before any rack goes in.
- Robots: Google is piloting robots to move heavy GPU racks and handle drives; Microsoft formed a robotics team in 2023; Novva runs Boston Dynamics Spot robots on heat and leak patrols in Utah.
Flagship
Microsoft Sydney: Three People and Seven Chillers
- Event: in August 2023 a power sag during a storm tripped all five running chillers at Microsoft's Australia East region in Sydney. Only one of two standby chillers started, because its pumps never got a run signal.
- Staffing: three people were on the night shift, too few to restart the chillers by hand at that scale, so hardware had to be shut down to save it.
- Fix: Microsoft raised night staffing from three to seven and worked with the chiller maker on the restart sequence.
- Lesson: automation, written procedures and headcount have to be sized together. See Facility Resilience.
Practice
Facility Operations in Practice
| Item | Fact | Status |
|---|---|---|
| Microsoft Sydney night shift | 3 staff on shift, raised to 7 after the August 2023 chiller event | Measured |
| Google Kansas City campus | About 200 permanent staff for 500 MW | Reported |
| Amazon Mississippi AI campus | About 200 direct roles planned | Planned |
| Commissioning liquid-cooled halls | Flush rack loops at 10-20 ft/s; 5-micron filters at coolant units; run fluid a week before racks | Practice |
| Google robotics pilot | Robots move racks, handle drives and service equipment | Pilot |
| Microsoft robotics team | Formed October 2023 | Operating |
| Novva Data Centers, Utah | Boston Dynamics Spot robots patrol for heat and leaks | Operating |
| CBRE and JLL | CBRE data center services revenue up 30%; JLL manages 340 data centers | Q2 2026 |
Record
Dataset Record
- Dataset
- Facility staffing, commissioning, robots and outsourced facility management
- Sources
- Microsoft post-incident review via DatacenterDynamics, Data Center Knowledge, Tetra Tech, TechSpot, CBRE and JLL earnings via Facilities Dive
- Last verified
- October 2026