Below are the most consequential planned or under-development hyperscale/AI data-center projects we’re tracking. Rankings reflect a mix of announced campus MW, compute scale (GW-class), and strategic significance. Dates, designs, and capacities evolve; treat these as live program entries you’ll update as filings land.
Rank | Project / Campus | Operator | Location | Status | Scale (MW / GW) | Target In-Service | Notes |
---|---|---|---|---|---|---|---|
1 | Stargate AI Supercluster (U.S.) | OpenAI + Microsoft + Oracle + G42 | Texas, USA | Planning / land + utility positioning | 5–10 GW (largest planned) | Late decade (phased) | Dubbed the “AI Manhattan Project”; largest AI datacenter build ever attempted. |
2 | Stargate AI Supercluster (UAE) | G42 + Microsoft / OpenAI alignment | Abu Dhabi, UAE | Announced | ~5 GW (planned) | Late decade | Twin-campus with Texas Stargate; centerpiece of G42’s AI ambitions. |
3 | Hyperion AI Supercluster | Meta | Richland Parish, Louisiana, USA | Under construction | 2 GW by 2030; scale to ~5 GW | 2027 (phased) • 2030+ | Multi-GW AI campus; massive grid build-outs approved/advancing. |
4 | Prometheus AI Supercluster | Meta | New Albany, Ohio, USA | Under construction | ˜1 GW (first multi-GW Meta site) | 2026 (initial) | First “titan” cluster; rapid modular build approach. |
5 | Colossus / Colossus 2 | xAI | Memphis, Tennessee, USA | Operating & expanding | 200k+ GPUs; local gen permits | 2024 (v1) • 2025+ (v2) | Gigafactory-of-compute; expansion with onsite turbines. |
6 | Susquehanna (Ex-Cumulus) Nuclear Campus | AWS | Salem Twp., Pennsylvania, USA | Planned / site acquired | Up to 960 MW | Mid-/late decade | Nuclear-adjacent campus acquired from Talen; zero-carbon adjacency. |
7 | Mount Pleasant AI Campus | Microsoft | Racine County, Wisconsin, USA | Under construction | ~450 MW (campus) | 2026 (phase 1) | Former Foxconn site; phase-2 expansion announced. |
8 | Mesa AI Data Center | Mesa, Arizona, USA | Under development | 400+ MW renewables contracted | Mid-decade (phased) | Clean-energy procurement to back high-density compute. | |
9 | Hokkaido Tomakomai “Brain DC” | SoftBank | Tomakomai, Hokkaido, Japan | Groundbreaking complete | >300 MW • ~700,000 m² | Late-decade (phased) | Flagship AI data center; decentralization strategy. |
10 | NEOM Oxagon AI Campus | DataVolt | Oxagon, NEOM, Saudi Arabia | Announced; partner awards | Multi-hundred-MW (phase 1) | ~2028 (phase 1) | Net-zero AI “factory”; major cooling OEMs already engaged. |